OPMAC is an oil pipeline operated by TAMAC, initiating at Origem Energia´s industrial site, at the Pilar Station in Alagoas, extending for 28 km to the company’s terminal located at the Port of Maceió. The pipeline has a diameter of 8 inches, allowing a minimum flow rate of 130 m³/h and a maximum flow rate of 160 m³/h.
Structure
Characteristics
Length: | 28Km |
Diameter: | 8” |
Flow Rate: | 130 a 160m³/h |